Every hour, analyzers measure metals concentrations at Butler Park and Duncan Flats. Near real-time data is transmitted to Teck Trail Operations’ process control systems. If Pb levels begin to rise, plants at Teck Trail Operations are automatically notified so that actions can be taken to reduce Pb emissions.